SUMMARY
G-CAHA
'A' CHECK NOT COMPLETED
INSTALL NLG LOCK STRUT
RR(23/12/2023): NLG LOCK STRUT INSTALLED WITH SLAVE BOLTS. AWAITING NEW PARTS.
INSTALL RH MLG LOCK STRUT
RR(23/12/2023): RH MLG LOCK STRUT INSTALLED WITH SLAVE BOLTS. AWAITING NEW PARTS.
INSTALL LH MLG LOCK STRUT
RR(23/12/2023): LH MLG LOCK STRUT INSTALLED WITH SLAVE BOLTS. AWAITING NEW PARTS.
INSTALL RH WING
RR(23/12/2023): RH WING INSTALLED WITH SLAVE BOLTS. AWAITING NEW ATTACHMENT HARDWARE.
INSTALL LH WING
RR(23/12/2023): LH WING INSTALLED WITH SLAVE BOLTS. AWAITING NEW ATTACHMENT HARDWARE.
INSTALL LH ENGINE
RR(23/12/2023): LH ENGINE INSTALLED IAW. AMM AND MOUNTING BOLTS TORQUED.
Aircraft awaiting recertification